04 / The rebuild / From the 2025 portfolio

Two inches out.
Worth starting again.

A spa arrived from a previous crew about two inches out of alignment. Destiny took it back to preparation and rebuilt the finish.

Blue mosaic spa with stone coping after the rebuild
The result / Actual Destiny project from the portfolio
The problemApprox. 2 inches out
The approachDemolish + prepare again
The resultA rebuilt spa finish

01 / The problem

The finish could wait.
The alignment couldn’t.

The spa came to Destiny from an earlier stage of the build, completed by another crew. It was approximately two inches out of alignment.

Before the tile could become the focus, the underlying work needed attention.

02 / The work

Back to preparation.

Destiny demolished the existing work and prepared the spa again. The aim was to restore alignment, prepare the area correctly and reduce the risk of future water infiltration.

03 / The result

A clean,
rebuilt finish.

The completed spa appears in Destiny’s 2025 portfolio, finished with blue mosaic tile and stone coping.

Some jobs begin by putting earlier work right. That preparation belongs in the story as much as the final surface.

Close view of the blue mosaic and coping on the rebuilt spa
After / Detail from the same portfolio photograph

Your next project

Send us your
next job.

Scope, plans, photos or measurements.
Let’s talk through the work.

Request a bid